Difference between revisions of "Workshop"
MikeTheRed (talk | contribs) m (→See Also: Redirect to new page title) |
m (→General Information: fixed wikilink, added note) |
||
Line 5: | Line 5: | ||
Workshop = Manufacturing = Money. Never have idle engineers, have them make something (anything) so you can sell it, even if you don't need it. Just be careful of using raw alien materials - [[Elerium-115]], for example, is too precious to convert into cash.<br> | Workshop = Manufacturing = Money. Never have idle engineers, have them make something (anything) so you can sell it, even if you don't need it. Just be careful of using raw alien materials - [[Elerium-115]], for example, is too precious to convert into cash.<br> | ||
<br> | <br> | ||
− | The [[Fusion Ball Launcher]] is the most profitable project you can mass produce that does not use alien materials. See [[ | + | The [[Fusion Ball Launcher]] is the most profitable project you can mass produce that does not use alien materials, with [[Laser Cannon]] a close second. See [[Manufacturing Profitability]] for details and other costs. It could be argued, however, that [[Alien Alloys]] are very quick to build, and much more useful, although they provide about one third the profit. |
== Statistics == | == Statistics == |
Revision as of 05:06, 6 May 2006
General Information
The workshop has 50 units of space. Each unit can accomadate one working engineer, however development projects use multiple units of space.
Workshop = Manufacturing = Money. Never have idle engineers, have them make something (anything) so you can sell it, even if you don't need it. Just be careful of using raw alien materials - Elerium-115, for example, is too precious to convert into cash.
The Fusion Ball Launcher is the most profitable project you can mass produce that does not use alien materials, with Laser Cannon a close second. See Manufacturing Profitability for details and other costs. It could be argued, however, that Alien Alloys are very quick to build, and much more useful, although they provide about one third the profit.
Statistics
Construction Time: 32 days
Construction Cost: $800,000
Maintenance Cost: $35,000/month