Difference between revisions of "EMP Cannon (EU2012)"
Jump to navigation
Jump to search
m (Added category) |
m |
||
Line 3: | Line 3: | ||
- Minimum Engineers Required: 30 | - Minimum Engineers Required: 30 | ||
− | - Cost (38 Engineers): §89, 8x | + | - Cost (38 Engineers): §89, 8x Elerium, 13x Alloys, |
[[Category: Enemy Unknown (2012)]] | [[Category: Enemy Unknown (2012)]] |
Revision as of 07:35, 22 October 2012
- Project Cost: 20 Elerium
- Minimum Engineers Required: 30
- Cost (38 Engineers): §89, 8x Elerium, 13x Alloys,