Genetics Lab (EU2012)
Jump to navigation
Jump to search
This page is a stub. You can help UFOPaedia by expanding it.
Description |
Source: XCOM: Enemy Unknown (2012)
|
Notes
Research Required | |
Manpower Required | |
Base Costs | §50 |
Power | |
Maintenance | § per month |
Build Time | 10 days |
Provides | |
Adjacency Bonus |
See Also
XCOM: Enemy Unknown (2012): Base Facilities | |||||||||||
Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
Additions: |
| ||||||||||
Strategic: | Building Optimization |