Difference between revisions of "Laboratory"
Jump to navigation
Jump to search
(Redirecting.) |
m (→Statistics: maintenance cost update) |
||
Line 9: | Line 9: | ||
Construction Time: 26 days<br> | Construction Time: 26 days<br> | ||
Construction Cost: $750,000<br> | Construction Cost: $750,000<br> | ||
− | Maintenance Cost: $30,000/month<br> | + | Maintenance Cost: <s>$30,000/month</s> (see [[Maintenance costs]])<br> |
Allows [[Research]] (50) | Allows [[Research]] (50) |
Revision as of 22:46, 2 March 2007
General Information
A Laboratory allows you to assign up to 50 scientists to Research. The more scientists you assign to a project, the faster it will be completed.
Statistics
Construction Time: 26 days
Construction Cost: $750,000
Maintenance Cost: $30,000/month (see Maintenance costs)
Allows Research (50)