Difference between revisions of "Talk:Engineering (EU2012)"

From UFOpaedia
Jump to navigation Jump to search
(Created page with "I have a potential formula for manufacturing costs: final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ] needs to be tested! ~~~~")
 
m
Line 1: Line 1:
 
I have a potential formula for manufacturing costs:  
 
I have a potential formula for manufacturing costs:  
 
final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ]
 
final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ]
needs to be tested! [[User:Momerathe|Momerathe]] 17:33, 6 October 2012 (EDT)
+
. It needs to be tested! [[User:Momerathe|Momerathe]] 17:33, 6 October 2012 (EDT)

Revision as of 21:33, 6 October 2012

I have a potential formula for manufacturing costs: final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ] . It needs to be tested! Momerathe 17:33, 6 October 2012 (EDT)