Difference between revisions of "Talk:Engineering (EU2012)"
Jump to navigation
Jump to search
m |
|||
Line 2: | Line 2: | ||
final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ] | final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ] | ||
. It needs to be tested! [[User:Momerathe|Momerathe]] 17:33, 6 October 2012 (EDT) | . It needs to be tested! [[User:Momerathe|Momerathe]] 17:33, 6 October 2012 (EDT) | ||
+ | The engineers requirements listed for uplink/workshop/nexus are wrong - it depends on how many you already have built. [[User:Momerathe|Momerathe]] 05:27, 12 October 2012 (EDT) |
Revision as of 09:27, 12 October 2012
I have a potential formula for manufacturing costs: final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ] . It needs to be tested! Momerathe 17:33, 6 October 2012 (EDT) The engineers requirements listed for uplink/workshop/nexus are wrong - it depends on how many you already have built. Momerathe 05:27, 12 October 2012 (EDT)