Talk:Engineering (EU2012)
Jump to navigation
Jump to search
I have a potential formula for manufacturing costs: final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ] . It needs to be tested! Momerathe 17:33, 6 October 2012 (EDT)
The engineers requirements listed for uplink/workshop/nexus are wrong - it depends on how many you already have built. Momerathe 05:27, 12 October 2012 (EDT)