Difference between revisions of "Workshop"
m (categorizing) |
|||
Line 57: | Line 57: | ||
[[Category:Base Facilities (EU)]] | [[Category:Base Facilities (EU)]] | ||
+ | [[Category:Enemy Unknown/UFO Defense]] |
Revision as of 03:52, 23 July 2013
General Information
The workshop has 50 units of space, each engineer working on a project requires 1 unit of space. Each project also has it's own unit requirement.
Workshop = Manufacturing = Money. Never have idle engineers, have them make something (anything) so you can sell it, even if you don't need it. Just be careful of using raw alien materials - Elerium-115, for example, is too precious to convert into cash.
The Laser Cannon is the most profitable project you can mass produce. If you take the cost of materials (Alien Alloys) into account, the Fusion Ball Launcher is about 25% less profitable. See Manufacturing Profitability for details.
This base facility appears in UFO: Enemy Unknown. For the Terror from the Deep equivalent, refer to Workshop (TFTD).
Statistics
Construction Time: 32 days
Construction Cost: $800,000
Maintenance Cost: $35,000/month
Project space requirements
- Fusion Ball Launcher: 6 units
- Laser Cannon: 6 units
- Plasma Beam: 8 units
- Fusion Ball: 6 units
- Tank/Laser Cannon: 25 units
- Hovertank/Plasma: 30 units
- Hovertank/Launcher: 30 units
- HWP Fusion Bomb: 25 units
- Laser Pistol: 2 units
- Laser Rifle: 3 units
- Heavy Laser: 4 units
- Motion Scanner: 4 units
- Medi-Kit: 4 units
- Psi-Amp: 4 units
- Heavy Plasma: 4 units
- Heavy Plasma Clip: 4 units
- Plasma Rifle: 4 units
- Plasma Rifle Clip: 4 units
- Blaster Launcher: 5 units
- Blaster Bomb: 3 units
- Small Launcher: 3 units
- Stun Bomb: 2 units
- Alien Grenade: 2 units
- Personal Armour: 12 units
- Power Suit: 12 units
- Flying Suit: 12 units
- Alien Alloys: 10 units
- UFO Power Source: 22 units
- UFO Navigation: 18 units
- Firestorm: 30 units
- Lightning: 34 units
- Avenger: 36 units