Difference between revisions of "Workshop (Long War)"

From UFOpaedia
Jump to navigation Jump to search
m (categorizing)
Line 14: Line 14:
  
 
[[Category: Long War]]
 
[[Category: Long War]]
[[Category: Facilities (Long War)]]
+
[[Category: HQ facilities (Long War)]]

Revision as of 14:07, 10 June 2014

Prerequisites: None

Build Normally:
Time to Build: 21 Days (? days with Advanced Construction)
Requirements: 4 Power, 10 Engineers, $200

Build Quickly:
Time to Build: 11 Days (? days with Advanced Construction)
Requirements: 4 Power, 10 Engineers, $300, 10x Meld

Maintenance: $30 every month
Notes: Each workshop adds 5 engineers to our staff.
Adjacency Bonus: +5% refund on resources when building vehicles, foundry projects and facilities.