Power Generator (EU2012)
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Description |
Power Generators supply the power needed to run new facilities. Each generator supplies +6 power. Adjacency Bonus: +2 power for every adjacent power facility. |
Source: XCOM: Enemy Unknown (2012)
|
Notes
Research Required | N/A |
Manpower Required | N/A |
Base Costs | §60 |
Power | N/A |
Maintenance | §11 per month |
Build Time | 5 days |
Provides | 6 power |
Adjacency Bonus | +2 per power facility |
Depending on the Difficulty Level and how many/the location of Steam Vents, it may be possible to never have to build one of these in the entire course of a game.
See Also
XCOM: Enemy Unknown (2012): Base Facilities | |||||||||||
Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
Additions: |
| ||||||||||
Strategic: | Building Optimization |