Power Generator (EU2012)
Jump to navigation
Jump to search
Description |
Power Generators supply the power needed to run new facilities. Each generator supplies +6 power. Adjacency Bonus: +2 power for every adjacent power facility. |
Source: XCOM: Enemy Unknown (2012)
|
Notes
Research Required | N/A |
Manpower Required | N/A |
Base Costs | §60 |
Power | N/A |
Maintenance | §11 per month |
Build Time | 5 days |
Provides | 6 power |
Adjacency Bonus | +2 per power facility |
Depending on the Difficulty Level and how many/the location of Steam Vents, it may be possible to never have to build one of these in the entire course of a game.
See Also
XCOM: Enemy Unknown (2012): Base Facilities | |||||||||||
Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
Additions: |
| ||||||||||
Strategic: | Building Optimization |