Difference between revisions of "Satellite Uplink (EU2012)"
Jump to navigation
Jump to search
m |
m |
||
Line 8: | Line 8: | ||
{{Facilities Data Box (EU2012) | {{Facilities Data Box (EU2012) | ||
|requires=N/A | |requires=N/A | ||
− | | | + | |manpower=5 engineers, +10 for each additional Uplink |
|costs=§150 | |costs=§150 | ||
|power=5 | |power=5 |
Revision as of 18:18, 2 November 2013
Description |
With the signal monitored by a team of engineers, each Satellite Uplink is capable of receiving transmissions from 2 XCOM satellites. Adjacency Bonus: +1 satellite capacity for every two uplinks constructed adjacent to one another. |
Source: XCOM: Enemy Unknown (2012)
|
Notes
Research Required | N/A |
Manpower Required | 5 engineers, +10 for each additional Uplink |
Base Costs | §150 |
Power | 5 |
Maintenance | §15 per month |
Build Time | 14 days |
Provides | Deployment of 2 satellites |
Adjacency Bonus | +1 satellite per Uplink/Nexus |
See Also
XCOM: Enemy Unknown (2012): Base Facilities | |||||||||||
Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
Additions: |
| ||||||||||
Strategic: | Building Optimization |