Difference between revisions of "Satellite Nexus (EU2012)"
Jump to navigation
Jump to search
m |
|||
(2 intermediate revisions by one other user not shown) | |||
Line 7: | Line 7: | ||
{{Facilities Data Box (EU2012) | {{Facilities Data Box (EU2012) | ||
|requires=[[UFO Flight Computer (EU2012)|Alien Nav Computer]] | |requires=[[UFO Flight Computer (EU2012)|Alien Nav Computer]] | ||
− | | | + | |manpower=5 Engineers, +15 for each additional Nexus |
− | |costs=§300, 25 Alloys, 2 UFO Flight Computer | + | |costs=§300 (§250 in EW), 25 Alloys, 2 UFO Flight Computer |
|power=8 | |power=8 | ||
+ | |maintenance=§26 per month | ||
|build time= 21 days | |build time= 21 days | ||
|provides= Deployment of 4 satellites | |provides= Deployment of 4 satellites |
Latest revision as of 21:48, 9 December 2013
Description |
With the signal monitored by a team of engineers, each Satellite Nexus is capable of receiving transmissions from 4 XCOM satellites. Adjacency Bonus: +1 satellite capacity for every two uplinks constructed adjacent to one another. |
Source: XCOM: Enemy Unknown (2012)
|
Notes
Research Required | Alien Nav Computer |
Manpower Required | 5 Engineers, +15 for each additional Nexus |
Base Costs | §300 (§250 in EW), 25 Alloys, 2 UFO Flight Computer |
Power | 8 |
Maintenance | §26 per month |
Build Time | 21 days |
Provides | Deployment of 4 satellites |
Adjacency Bonus | +1 satellite per Uplink/Nexus |
- The Nexus is the equivalent of two Uplinks only in one base slot rather than two.
See Also
XCOM: Enemy Unknown (2012): Base Facilities | |||||||||||
Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
Additions: |
| ||||||||||
Strategic: | Building Optimization |